Transformed Gateway now open

The Gateway building on City Campus has re-opened this week after a complete transformation of the ground floor. 

The main entrance to the Gateway, the entire ground floor including Student Gateway, Sunderland Futures and the cafe area, as well as the Students' Union on the first floor, closed in April 2019 to allow for the spaces to be gutted, reconfigured and redecorated.

Staff and students eagerly anticipated the reveal on 5 August and were not disappointed. The floor now feels airy and spacious and there are clearly zoned areas for Student Gateway and Sunderland Futures. The new Gateway Cafe offer mirrors the enhanced spaces staff and students are already enjoying in Prospect and CitySpace buildings. 

Return to AboutUS

 

 w/c 5 Augw/c 12 Augw/c 19 AugBack to normal 
The Studio7.45am-6pm7.45am-6pm7.45am-6pm16 Sept
Riverside8am-5pm8am-5pm8am-5pm16 Sept
Murray Library8.30am-3pm8.30am-5pmClosed16 Sept
Gateway Cafe7.45am-5pm7.45am-5pm7.45am-5pm5 Aug
PriestmanClosedClosedClosed16 Sept
Hope Street Xchange8.30am-3.30pm8.30am-3.30pm8.30am-3.30pm16 Sept
Sciences CostaClosedClosedClosed16 Sept
Reg VardyClosedClosedClosed16 Sept
Balcony (St Peter's)ClosedClosedClosed16 Sept

    Link to this page